We have completed a general overhaul of a GOTTWALD crane.
The place of works was, of course, the Pomerania Shipyard. The scope included hydraulic and steel works, maintenance, replacement of critical components, performance tests and overload tests. An extremely important and, at the same time, very spectacular element of the works was the foundation of the crane on the wharf, and after the repairs, its reloading on a special barge, on which it was delivered back to its proper place of work.